Docket Enterprise - Move an Activity from one Matter to Another
This link is a video of moving an activity from one matter to another (no audio) - https://bracheichler.sharefile.com/d-s89a6e0ee4c13497ab68242dad39cc2b8https://bracheichler.sharefile.com/d-s89a6e0ee4c13497ab68242dad39cc2b8
Below are the instructions for moving a single date from one matter to another without having to delete and re-enter.
- Open the matter and click the workplans tab
- If the date to be moved is in a workplan with other dates,
- Click Create New Workplan and give it a name (the name doesn’t make a difference)
- Choose the workplan which contains the date to be moved
- In the action panel click Move to Workplan
- If not selected, chose the temporary workplan from the drop down in the right side of the dialog
- Choose the activity(ies) to be moved and click the right facing arrow
- Click OK
- If the date to be moved is in a workplan by itself, skip 2 above
- Select the workplan which contains the date to be moved
- In the action panel choose Move to Matter
- Select and double click the Matter that you want to move the date to
- You will get an OK prompt when the workplan is moved
- IF DESIRED:
- Open the matter which you moved the workplan to
- Click the workplan tab
- Choose the moved workplan
- In the action panel choose Move to Default Workplan
i. This will merge the two workplans
- Click OK
- Close the matter
Files | ||
---|---|---|
![]() |
OriginalEmail.eml 39 KB |